Deliverable 5.2, Final Demonstration Implementation Report

Deliverable 5.2, Final Demonstration Implementation Report, was accepted by the European Commission in November 2003. The deliverable describes the road user charging scheme implemented or trialled in each of the PRoGRESS partner cities, and reports any elements of scheme design and modelling work that was not completed for inclusion in D3.2. More information can be found in the following Executive Summary:

Summary of D5.2 Summary of D5.2 (PDF: 103 Kb / 4 pages)

For more detailed information, the whole deliverable can be accessed as a pdf file through the link below:

D5.2 D5.2 (PDF: 13.48 Mb / 193 pages)